top of page
IFly Fit Out
Dlux Air recently completed the fit out of The escape rooms Mystery House on the ground floor of the I Fly building in Belmont.
​
The project consisted of installing 2 Actron Air ducted units complete with sheet metal duct work and interlocked with outside air fans.
​
Phase 1 of the installation was to fit the fan coil units, sheet metal duct work flexible duct and cushion heads.
​
Phase 2 is fit off the grills and complete the air balancing and full commission ready for hand over tot he client.

Ifly duct

Ifly OAF 1

I Fly

Ifly duct
1/8
bottom of page